Testbeam Beamline To Do List
KEY: Future
In progress
Done
- Fix F17/18 aperture problem
- Calculate and store optics for all lower energy tunes
- Fix local controls of Cerenkov 2 - if needed.
- Add an accurate low pressure sensor
- Trade in bad Drogie power supplies (CRN?)
- Fix inhibit on beam scaler modules.(Charles)
- Add coincidences to MT6SC2,3,4 (Charles)
- Fix dead PM on Cerenkov #2 (Erik, Charles)
- Have surveyors modify the vertical of the swics
- Build 50 ohm passive splitters
- Retune clips on beam scintillators (90%)
- Fix Air Handler sump pump at MT6BS.
- Fix HV, readout of swics MT5,6
- Move MT6PWC4 to better align it vertically (CRN 6-Aug-03)
- Test MT6BS motion (Beam tuners)
- Remove covers from the 3 MT6 swics(Gianni)
- Put MT6 beam stop into the ACNET database(Brian Kramper)
- Determine status of slow extraction plans
- Start gas flowing in MT6 PWCs
- Fix reset on beam scaler modules.
- Fix polarity of swic scanner inputs in MT3,4,5,6
- Install adcs on beam scintillators in MT3,4,5,6
- Fix MT4SC1 (Charles).
- Find Pixel ORC and get it moving.
- Clean up tools and other misc items along beamline
- Make a safety walk thru
- Get appropriate sign-offs
- Repair Fence Hole at MS03/4 Gate (Beam Div)
- Complete Shielding Assessment (Chuck Brown and company)
- Complete Safety Assessment Document (Chuck, Anderson, etc)
- Do MARS calculation for the pinhole collimator target
- Repair Pinhole Collimator stand(beams)
- Lower Pinhole Collimator into place
- Align and test pinhole collimator controls (Al Legan)
- M03 Finger counters
- Locate the stand near the Pinhole Collimator
(Done 21-Mar-03 Erik and Charles)
- Connect signal and HV cables from ctrs to the M02
external patch panel (Done 23-May-03 Erik and Charles)
- Connect signal and HV cables from the patch
panel to a cow and camac crate.(Done 21-Mar-03
Charles,Erik)
- Bolt Scintillator stand to the floor (Done 2-Jun-03 Tom)
- Install Scintillators (Done 2-Jun-03 Charles,Erik)
- Test Scintillators (Done 2-Jun-03 Charles,Erik)
- Fix light leak in 1 of the scintillators
- Remove the last single wire drift chamber from stand, move
stand into the beam line (Done 20-Mar-03 Charles & Erik)
- Cable up MT5SC1 to MS04 Racks (done 19-Mar-03 Erik & Charles)
- Cable up MT5CC2 to MS04 Racks (done 19-Mar-03 Erik & Charles)
Last updated: Sept 13, 2004 by CRN