MT6C Staging Area Project
- Shop hut
- Initial drawing by C. Newsom is done.
- Leon Beverly has reviewed the design. No changes were made.
- John Egan and Herman Cease are putting together a real set
of drawings.
- Remove magnets from east side of the pad (5-may-03)
- Test and move roofing material (CRN)
- Construct shop area (19-aug-03 crn)
- Install AC power
- Install ceiling lights
- Install Herculite
- Install hanging door
- Muon hut
- Create initial drawings
- Order unistrut
- Assemble the skeleton
- Install Herculite
- Install hanging door
- Install ceiling
- Install AC power
- Install ceiling lights
- Install AC units
- Assembly hut
- Create initial drawings
- Order unistrut
- Create cut list
- Cut unistrut
- Assemble the skeleton
- Install ceiling
- Install AC power
- Install ceiling lights
- Install Herculite
- Install AC units
- Install doors